Native Dog Creek

BRIDGE DEMOLITION

DATE

February – April 2010

LOCATION

Native Dog Creek NSW

CLIENT

RTA

VALUE

$150,000

Overview

The RTA needed to remove the existing sixty year old, three-span bridge and specified the bridge was to be removed with absolutely no contamination to the creek which, after ten long years of drought, was now flowing again. DecoTEC installed drip trays on the bridge to catch any slurry or debris. The deck and beams were cut and lifted in accordance with a certified methodology. The reinforcement was then separated from the concrete so that all waste could be recycled.