Brisbane Airport Link
ACCELERATED WIRE SAWING
DATE
January – March 2012
LOCATION
Brisbane QLD
CLIENT
John Holland
VALUE
$ 1,200,000
Overview
DecoTEC were called upon to cut and lift the heavily reinforced concrete flood walls above the new constructed Brisbane Airport Link tunnel. Over 800m2 of wire sawing and 230m of coring had to be completed within a six week program and only DecoTEC could provide TJH with the confidence that the job would get done within the constraints.