Fairbairn Dam

DAM MODIFICATION

DATE

October 2019 – June 2020

LOCATION

Emerald, QLD

CLIENT

SRG Global Civil

VALUE

$ 860K

Overview

SRG were engaged by SunWater to install 78 post-tensioned anchors into the spillway crest to strengthen the dam. SRG required Decotec to core drill a 1000mm x 1.5m deep hole followed by a 250mm x 3.5m deep hole for each anchor. ITP’s were utilised to record all details to ensure holes were cored well within the required tolerances.

“Superior quality and ability to adapt to the contractors needs. Field workers showed great potential.”

Manuel Barbara | SRG Senior Project Engineer