Avon Dam Rd Bridge

BRIDGE DEMOLITION

DATE

November 2020 – February 2021

LOCATION

Bargo NSW

CLIENT

Select Civil

VALUE

$ 350K

Avon Dam Rd Bridge Demolition Overview

Select Civil engaged Decotec to demolish the existing Avon Dam Rd bridge so they could construct an upgraded bridge in its place. A narrow 1km road led down to the bridge resulting in incredibly difficult access for craneage and haul trucks. The existing bridge was cut into 12 tonne sections and lifted onto semi trailers using a 350tonne crane. The trucks reversed each beam back up narrow access road to the stockpile area for processing.

“Josh and his team provided a detailed methodology for the works in a difficult location and an environmentally sensitive area (WaterNSW catchment). They completed the works without any issues and to a very high standard. We would not hesitate to use Decotec in the future.”

Alan Farrell  |  Select Civil Construction Manager