by josh.s.donovan | Apr 1, 2012
Brisbane Airport Link ACCELERATED WIRE SAWING DATE January – March 2012 LOCATION Brisbane QLD CLIENT John Holland VALUE $ 1,200,000 Overview DecoTEC were called upon to cut and lift the heavily reinforced concrete flood walls above the new constructed Brisbane...
by josh.s.donovan | Sep 28, 2011
Wellington Dam DAM SAFETY UPGRADE DATE March 2010 – August 2011 LOCATION Collie, WA CLIENT Wellington Dam Alliance (WDA) VALUE $ 1,9000,000 Overview Wire sawing slots into the spillway crest to allow installation of bridge piers and core drilling large diameter...
by josh.s.donovan | Jul 4, 2010
Hinze Dam DAM SAFETY UPGRADE DATE March 2008 – June 2010 LOCATION Gold Coast QLD CLIENT Thiess VALUE $2,000,000 Overview The Hinze Dam Stage 3 Upgrade was designed to double the capacity of south east Queensland’s water supply. DecoTEC was engaged to...
by josh.s.donovan | May 4, 2010
Native Dog Creek BRIDGE DEMOLITION DATE February – April 2010 LOCATION Native Dog Creek NSW CLIENT RTA VALUE $150,000 Overview The RTA needed to remove the existing sixty year old, three-span bridge and specified the bridge was to be removed with absolutely no...