Brisbane Airport Link

Brisbane Airport Link

Brisbane Airport Link ACCELERATED WIRE SAWING DATE January – March 2012 LOCATION Brisbane QLD CLIENT John Holland VALUE $ 1,200,000 Overview DecoTEC were called upon to cut and lift the heavily reinforced concrete flood walls above the new constructed Brisbane...
Wellington Dam

Wellington Dam

Wellington Dam DAM SAFETY UPGRADE DATE March 2010 – August 2011 LOCATION Collie, WA CLIENT Wellington Dam Alliance (WDA) VALUE $ 1,9000,000 Overview Wire sawing slots into the spillway crest to allow installation of bridge piers and core drilling large diameter...
Hinze Dam

Hinze Dam

Hinze Dam DAM SAFETY UPGRADE DATE March 2008 – June 2010 LOCATION Gold Coast QLD CLIENT Thiess VALUE $2,000,000 Overview The Hinze Dam Stage 3 Upgrade was designed to double the capacity of south east Queensland’s water supply. DecoTEC was engaged to...
Native Dog Creek

Native Dog Creek

Native Dog Creek BRIDGE DEMOLITION DATE February – April 2010 LOCATION Native Dog Creek NSW CLIENT RTA VALUE $150,000 Overview The RTA needed to remove the existing sixty year old, three-span bridge and specified the bridge was to be removed with absolutely no...